Enhancing Water Infrastructure: Building a Modern 3.75 MGD Water Treatment Plant with Advanced Facilities and Upgraded Well Houses

This project consists of the new construction of a water treatment plant with the capacity to treat 3.75 million gallons per day (MGD), including four 40,000 lb granular activated carbon (GAC) contactors, three chemical storage and feed facilities, two administrative offices, a laboratory, and restrooms. In addition, the DOC provided all associated HVAC, plumbing and electrical equipment, appurtenances, site piping, and site work. The project also includes pump upgrades in two existing well houses. This system will remove per- and polyfluoroalkyl substances (PFAS) from the drinking water for the surrounding Westfield community. The system also has pH adjustment, corrosion control, and disinfection as well as continuous chlorine monitoring.